1997

makrolab | project

construction schematic




measurements

length        1420 cm
width          570 cm
height         590 cm

operational systems:

HF all modes receive capability 2 units
HF SSB/CW/AM/FM/RTTY transmit-receive capability 1 unit
VHF 2m/40cm transmit-receive capability 2 units
C/Ku band video-audio receive 1 unit
Ku band ATV-data transmit 1 unit
L band ATV-data receive 1 unit
SCPC receive capability  3 units
FDM receive capability 1 unit
PC processing units    4 on site +2 remote

QTH locator: JO 40 SJ
radio beacon: 144.9625 (pending)
call signs: DH/S57NTS  DC/KB4UMQ


time plan

duration phase 1: 60 days
duration phase 2: 40 days
duration phase 3: XX days

base camp establishment:                               12.6.1997
ml console in documenta halle operational:    	       15.6.1997
backup energy systems operational:                     13.6.1997
main energy systems operational:              	       17.6.1997
level 1 communications suite operational:     	       20.6.1997
level 2 communications suite operational:     	       24.6.1997
level 3 communications suite operational:              03.7.1997

video link operational:                       	       19.6.1997

makrolab basic module operational:                     25.6.1997
end of operational test and systems period:             6.7.1997
continuous research in active mode beginning:           7.7.1997

exact location

LAT  51° 23' 10" N
LON   9° 35' 40" E
ALT          330 m




construction team:
bostjan hvala - jurij krpan - marko peljhan  

construction engineer: 
goran salamon

communications team: 
brian springer - christian mass - frank koeditz - marko peljhan  
borja jelic - luka frelih

public relations
spela mlakar

medical assistance:
matej bernhardt

logistics support team ljubljana: 
eda cufer - spela mlakar - mima suhadolc

ml_console manual
mima suhadolc - marko peljhan