mark II project | ||||||||
![]() |
|||||||||
makrolab 2000
- rottnest island vision
|
makrolab mark II project
The mark II setup consists of several basic improvements
of the modular architecture and all systems in general. New materials for
the inRatable membrane are used instead of the harmful PVC. Astro foil
is used for the new insulation layer. Air circulation will be highly improved
with the use of innovative computational models and a system of air-vents.
Air øltration and puriøcation equipment will be implemented. A modular
hydroponic unit built by N55 will be implemented. A new 2,5kW photovoltaic
power supply will be built, with a 4kW propane powered backup ecological
generator. The interior is completely redesigned and new modular elements
are implemented. The communication and control consoles are renewed and
include a modular, rugged øeld deployable 19inch rack system for equipment.
Water puriøcation and collection will be implemented. A new hygiene system
is constructed and waste disposal will be improved. 5 new emergency exists
are added, together with a semi-automatic øre supression system. 6 bunks,
4 with terminals and communication consoles for work and entreatinment
are added. The mark II system will be set up and operational on the 15.
of September 1999 at 0800 hours.
|
||||||||
![]() |
|||||||||